Burn and Coast
Live
News

ULA to bring Vulcan payload fairing manufacturing in-house

ULA will move payload fairing production from supplier Beyond Gravity to its Alabama facility, with the first in-house fairing set to fly in 2027.

ULA will move payload fairing production from supplier Beyond Gravity to its Alabama facility, with the first in-house...

United Launch Alliance has finalized an agreement to bring payload fairing manufacturing in-house for its Vulcan Centaur rocket. The company will take over production, sustaining engineering, and development work from long-time supplier Beyond Gravity USA, Inc., with the first ULA-produced fairing scheduled to fly on a mission in 2027.

This vertical integration resolves long-standing supply chain vulnerabilities. Those issues have delayed Vulcan's National Security Space Launch certification and its commercial return to flight.

Fairing production to shift before year-end

ULA President and CEO Mark Peller confirmed the timeline. "Upon closing of this agreement, before the end of the year, this work currently done by supplier Beyond Gravity will be transitioned to ULA," he said. The transition will occur before the end of the year following the agreement's closing.

More than 300 Alabama-based Beyond Gravity employees will be offered employment to join the ULA team after the agreement closes. Beyond Gravity has built fairings for ULA for over 20 years and has leased 400,000 square feet at ULA's Decatur, Alabama site since 2017.

Fairing specifications and manufacturing scope

Under the agreement, ULA will manufacture Vulcan's payload fairing and other composite structures. The fairing uses a bisector sandwich composite structure designed for debris-free horizontal and vertical separation.

ULA will also manufacture other components including heat shields, payload attach fittings, and inter-stage adapters. Peller stated that bringing this work in-house allows ULA to drive processes, maintain quality, improve efficiencies, and reduce rocket costs.

Broader context and launch delays

The move comes as ULA seeks to improve control and reduce costs in a competitive market. In 2023, there were 193 orbital launches in the U.S., with SpaceX accounting for 85% of them. SpaceX manufactures payload fairings for its Falcon rockets at its own plant in Hawthorne, California.

ULA's Vulcan program has faced significant setbacks. The Space Force suspended Vulcan launches under the NSSL program in February due to an anomaly with the Northrop Grumman GEM-63XL solid rocket motor. That incident occurred on February 12 during the USSF-87 mission, where an irregular plume emerged from one of the rocket's solid rocket motors.

A separate booster anomaly during Vulcan's second certification test flight in October 2024 further delayed the USSF-106 and USSF-87 launches. Consequently, the Space Force has switched six NSSL missions from Vulcan to SpaceX's Falcon 9 or Falcon Heavy rockets.

Vulcan's commercial return to flight is now scheduled for November 13. That mission will carry 40 satellites for Amazon's low Earth orbit broadband constellation from Cape Canaveral. The first ULA-produced fairing is scheduled to fly on a mission in 2027.

Topics

#News

Related coverage

More from News