Burn and Coast
Live
Launch

MaiaSpace stages logistics rehearsal for 2027 Kourou launch

MaiaSpace shipped full-scale mechanical models of its Maia rocket stages to French Guiana to validate ground operations ahead of its first orbital flight, now targeted for late 2027.

MaiaSpace shipped full-scale mechanical models of its Maia rocket stages to French Guiana to validate ground operations...

MaiaSpace conducted a logistics rehearsal using full-scale mechanical models of the first and second stages of its Maia rocket. The ArianeGroup subsidiary transported the hardware from its factory in Vernon, northern France, to the port of Le Havre on November 19, 2026, loading it onto the transatlantic vessel Canopée on November 22. After a ten-day voyage, the shipment arrived at Pariacabo on December 2. This operation validates the entire transport chain for delivering flight hardware to the Guiana Space Centre in Kourou.

The stages will be used to rehearse key ground operations at the spaceport. These include horizontal integration, vertical transfer to the launch pad, and testing of electrical and fluid interfaces. The rehearsal is a critical step before combined testing with the actual flight vehicle, which is now scheduled for the first half of 2027.

Maia rocket specifications and design

The Maia launch vehicle is a two-stage rocket standing 50 meters tall. It is designed to carry payloads of up to 4 metric tons to orbit. Both stages are powered by Prometheus engines, which use liquid bio-methane and liquid oxygen as fuel.

StageNumber of Prometheus EnginesFuel
First Stage3Liquid bio-methane & liquid oxygen
Second Stage1Liquid bio-methane & liquid oxygen

Maia is intended to be developed in both expendable and reusable versions. The reusable variant would feature landing legs to enable the first stage to be retrieved on a barge at sea.

Timeline for first orbital flight and commercial operations

MaiaSpace has abandoned earlier plans for a suborbital test flight. The company now targets a first orbital demonstration flight by the end of 2027. A MaiaSpace spokesperson confirmed the shift, stating, "the company was now targeting a first orbital flight by the end of 2027."

Commercial operations are expected to begin in 2028. The company has already secured agreements with several clients for its early flights. These include the satellite operator Eutelsat, the rideshare specialist Ride!, the Institute for Q-shu Pioneers of Space, and Space Cargo Unlimited, which has purchased capacity on the initial commercial mission.

Launch site and infrastructure

The Maia rocket will launch from the former Soyuz launch facility at the Guiana Space Centre. MaiaSpace is adapting this existing infrastructure at Kourou for its partially reusable rocket. Key systems, such as refuelling capabilities, are being reused for the new vehicle.

MaiaSpace expects to begin testing with the delivered mechanical models in the first half of 2027. The planned demonstration flight is scheduled for the second half of 2027.

Topics

#Kourou

Related coverage

More from Launch